    電氣成套設(shè)備列舉幾個包含的設(shè)備

    發(fā)布時間:2022-05-11 來源:http://www.aivkv.cn/ 瀏覽量:

    電氣成套是指制作在箱體或柜體中的電路系統(tǒng)單元,用戶只需外接通道即可。成套設(shè)計主要是指利用相關(guān)電氣元件,組成具有完整電氣功能的成套電氣設(shè)備。分為高壓成套設(shè)備和低壓成套設(shè)備。分線盒等,一般都是一些開關(guān)設(shè)備,主要使用刀開關(guān)、空氣開關(guān)和熔斷器。
    Electrical complete set refers to the circuit system unit made in the box or cabinet. Users only need external channels. Complete set design mainly refers to the use of relevant electrical components to form a complete set of electrical equipment with complete electrical functions. It is divided into high-voltage complete equipment and low-voltage complete equipment. Junction boxes are generally some switchgear, mainly using knife switches, air switches and fuses.
    配電箱
    Power Distribution Box
    全部或部分帶電工作時,應(yīng)有明顯標志將設(shè)備與操作設(shè)備分開。對于帶有電流互感器和電壓互感器的二次繞組,應(yīng)保證可靠的保護接地。電流互感器二次回路工作時,應(yīng)采取以下措施:嚴禁斷開電流回路,禁止在電流互感器與短路端子之間的電路和導(dǎo)線上工作,同時使用短路片和短路線,以確保可靠地短路電流互感器的次級線圈。
    In case of full or partial live working, there shall be obvious signs to separate the equipment from the operating equipment. For the secondary winding with current transformer and voltage transformer, reliable protective grounding shall be ensured. When the secondary circuit of the current transformer works, the following measures shall be taken: it is strictly prohibited to disconnect the current circuit, and it is prohibited to work on the circuit and conductor between the current transformer and the short-circuit terminal. At the same time, short-circuit pieces and short routes shall be used to ensure the reliable short-circuit of the secondary coil of the current transformer.
    配電盤(柜)
    Distribution board (cabinet)
    配電盤又稱配電柜,是一種集中、切換和分配電能的裝置。配電盤一般由機柜、開關(guān)(斷路器)、保護裝置、監(jiān)控裝置、電能表等二次元件組成。安裝在用電量大的電站、變電站和電力客戶。按電流可分為交流配電盤和直流配電盤。按電壓可分為照明配電盤和電源配電盤,或高壓配電盤和低壓配電盤。
    Distribution board, also known as distribution cabinet, is a device for centralizing, switching and distributing electric energy. The distribution board is generally composed of cabinet, switch (circuit breaker), protection device, monitoring device, electric energy meter and other secondary elements. Installed in power stations, substations and power customers with large power consumption. It can be divided into AC distribution board and DC distribution board according to current. According to voltage, it can be divided into lighting distribution board and power distribution board, or high-voltage distribution board and low-voltage distribution board.
    箱式變電站
    Box type substation
    一般是指裝配式變電站,也有非裝配式變電站。將變壓器、高低壓設(shè)備安裝固定在箱內(nèi),金屬或非金屬,制成箱體,然后將安裝好的箱體整體運現(xiàn)場,運現(xiàn)場后現(xiàn)場,把它連接到電腦線就可以使用了。
    Generally refers to the assembly type substation, and there are also non assembly type substations. The transformer and high and low voltage equipment are installed and fixed in the box, made of metal or non-metal, and then the installed box is transported to the site as a whole. After being transported to the site, it can be used by connecting it to the computer line.
    電氣成套
    當用電高峰來臨時,電流會繼續(xù)增加,相應(yīng)的電壓會降低。這時就需要一個箱式變電站來穩(wěn)定電壓。或者用于一些臨時供電設(shè)施,如建筑工地、碼頭、機場等,但每當我們需要在現(xiàn)有建筑條件下對電氣設(shè)備進行改造時,都可以使用箱式變電站。
    When the power consumption peak comes, the current will continue to increase and the corresponding voltage will decrease. At this time, a box type substation is needed to stabilize the voltage. Or for some temporary power supply facilities, such as construction sites, docks, airports, etc., but whenever we need to transform electrical equipment under existing building conditions, box type substation can be used.
    電氣成套設(shè)計具體根據(jù)設(shè)計圖紙、采購設(shè)備、材料、設(shè)備管理、數(shù)據(jù)管理等方面的要求進行。根據(jù)客戶的不同要求,根據(jù)我廠產(chǎn)品特點,進行成套開關(guān)柜組成設(shè)計,并根據(jù)客戶要求設(shè)計調(diào)整部分元件等設(shè)施。一個很大的工作就是根據(jù)客戶的特殊要求,對產(chǎn)品進行比較大的改造。
    The complete electrical design shall be carried out according to the requirements of design drawings, purchased equipment, materials, equipment management, data management, etc. According to the different requirements of customers and the product characteristics of our factory, the composition design of a complete set of switchgear is carried out, and some components and other facilities are designed and adjusted according to the requirements of customers. A great job is to carry out relatively large transformation of products according to the special requirements of customers.
    電氣成套設(shè)備列舉幾個包含的設(shè)備的相關(guān)內(nèi)容便是這樣了,如果您的需求正好符合的話,歡迎來我們網(wǎng)站www.aivkv.cn進行咨詢了解。
    The relevant contents of several equipment included in the complete set of electrical equipment are listed. If your needs just meet, please come to our website www.aivkv.cn Com.
    首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
    主站蜘蛛池模板: 香港经典a毛片免费观看播放| 中文字幕乱码人妻无码偷偷| 久久香蕉欧美精品| 一女被多男玩喷潮视频| 久久久久亚洲精品天堂| 97r久久精品国产99国产精| 亚洲精品乱码| 伊人桃花网| 亚洲色成人网站www永久| 丝袜制服无码国产| 岚皋县| 亚洲?无码?人妻| 久久天天躁狠狠躁夜夜网站| 91口爆| 国产乱沈阳女人高潮乱叫老| 无码午夜人妻一区二区三区不卡视频| 无码精品a∨动漫在线观看| 亚洲欧美另类在线| 欧美日韩一卡二卡| 影音先锋熟女| 亚洲日韩?国产丝袜?在线精品| 84pao强力打造跑强2023年最新进展 | 亚洲成人一卡| 肏屄的视频| 亚洲精品播放| 精品熟女日韩中文十区| 国产福利视频在线观看| 国产精品成人不卡乱码| 亚洲熟女性视频| 亚洲第一区二区快射影院| 亚洲欧美综合中文| 另类一区| 亚洲人成无码网站| 日日躁亚洲精品| 日韩精品免费一区二区夜夜嗨| 大伊香蕉在线精品视频75| 亚洲熟妇中文字幕五十中出| 免费一级毛片在级播放| 亚洲专区视频| www.com黄色| 国产a∨精品一区二区三区不卡|